More bridge construction photos. East bank abutment. Since these photos were taken I have backfilled the wall, poured concrete for the upstream wing, and begun foundation work on the down stream wing.
Tuesday, September 21, 2010
Sunday, September 12, 2010
Update photo progress.
Its been awhile since I posted any pics on the my woodfired water boiler project for home heating. Here is the boilerhouse showing the summers progress. Pretty much all the brickwork is now done. I still need to fit the windows in and build a door. Finish the roof and add the firewood chute from the adjacent wood shed are after that.