Tuesday, June 28, 2011

Working on my truss bridge again.

Really I have been working on it off and on all spring into summer. But I thought to post an update on where Im at with it. There are to efforts going on at the same time, pier construction and truss fabrication.
Im in the first stages of laying out the scrap metal to see what the trusses will look like and make changes where needed. I then have to cut all the pieces to fit together and make ready for welding.



Most of my work has been on the center pier lately. Adding height to it in order to bring it level with both bank abutments. Laying courses of free salvage concrete blocks and filling in the center of the pier with rocks and rubble from the creek, I have built a solid center load bearing structure. Both the ends are made from 55 gallon barrels filled with rock and covered in concrete. Im thinking about covering the long faces of the pier with brick to match the abutments.