Bridge on the move

Today was a good day. The bridge is now resting on its concrete piers. It was manual labor with a ratcheting chain winch and two comelongs. I used the dozer as a fixed anchor point only. The move and positioning of the trusses was too delicate for brute diesel power.


I spent all day on the move, inch by inch it crept outward over the abyss. Help arrived in the afternoon when my son returned home from school and lend me a hand to finish the work. Im greatful for his help. Im blessed with two near adult sons that I lean on from time to time.

The work is far from done, as now I have to finish the positioning and anchor the bridge in place. Then its putting in the beams and deck.