
Tuesday, September 21, 2010
More bridge building pics.
More bridge construction photos. East bank abutment. Since these photos were taken I have backfilled the wall, poured concrete for the upstream wing, and begun foundation work on the down stream wing.


Sunday, September 12, 2010
Update photo progress.

Its been awhile since I posted any pics on the my woodfired water boiler project for home heating. Here is the boilerhouse showing the summers progress. Pretty much all the brickwork is now done. I still need to fit the windows in and build a door. Finish the roof and add the firewood chute from the adjacent wood shed are after that.
Subscribe to:
Posts (Atom)