Tuesday, September 21, 2010
More bridge building pics.
More bridge construction photos. East bank abutment. Since these photos were taken I have backfilled the wall, poured concrete for the upstream wing, and begun foundation work on the down stream wing.


Sunday, September 12, 2010
Update photo progress.

Its been awhile since I posted any pics on the my woodfired water boiler project for home heating. Here is the boilerhouse showing the summers progress. Pretty much all the brickwork is now done. I still need to fit the windows in and build a door. Finish the roof and add the firewood chute from the adjacent wood shed are after that.
Thursday, August 26, 2010
Tuesday, August 24, 2010
Bridge progress #2
Its a slow process building my first bridge abutment on the east bank of my creek. Have to make the time after work and some more on weekends for the concrete pours and bricklaying. And to think this is only the first! I have to do it all over again on the west bank of the creek next.
At least I can count my blessings, the creek provides me with most of my raw materials. Sand, gravel and rocks are plentiful and free for the taking a mere few feet from where im building it.
I have no experience with building a bridge like this. What I know comes from exploring on the internet and looking around at other ones near my home for ideas. I know that the abutments have to be big and heavy so as not to be washed away when the spring floods come.
Tuesday, August 17, 2010
Ive started on my replacement bridge.

Im finally underway on my replacement bridge. The bridge will cross the small creek on the property that limits access to my workshop and future site of my pole barn. I am building the foundation piers on both banks. Not sure what form the finished bridge will take yet. I first had in mind a concrete or brick arch bridge, but have lately thought a steel pony truss bridge may be quicker and cheaper. i have most of the materials already on site. Either way its gonna be a long project. Probably a year to complete it if im lucky!
This is a small pony truss bridge photo to give you an example of what I want to build. The deck it missing from this old one though.
Here is another pic of a pony truss near my home. It has a poured concrete deck over steel under framework. My plans call for a span of about 32 feet and a deck width of aroun 12 feet.
Here is a stone arch bridge like the one I at first wanted to make. I think it would be to huge a job for me to try this now.
Tuesday, August 10, 2010
Bottle kiln, firing #2, better but not good
Monday, August 2, 2010
Monster results. Too hot!
The bricks literally MELTED! Wow thats gotta be the hottest kiln Ive made ever.

It took me a few hours with a hammer and chisel to force remove these clinkers.

Heres what it looked like when I first opened it up. You can see that more heat was at the center of the chamber. It was cooler th the edges. Well over 2000 in the middle. Maybe 1800 by the walls.

It took me a few hours with a hammer and chisel to force remove these clinkers.

Heres what it looked like when I first opened it up. You can see that more heat was at the center of the chamber. It was cooler th the edges. Well over 2000 in the middle. Maybe 1800 by the walls.
Saturday, July 31, 2010
New brick bottle kiln. The 'Monster'
My latest clay furnace is a small bottle updraft named 'Monster' by my daughter after an energy drink she says it looks like.


Just a bunch of firebricks surrounding an old cut up 55 gallon barrell. That surrounded by red brick.

It took me only 4.5 hours to reach 2000'F, and it could have went further if I pushed it. May have went too hot for the clay I was using for the test bricks inside.

Ive wanted to experiment with a different design, hoping to gain easier firings and higher temps.

Just a bunch of firebricks surrounding an old cut up 55 gallon barrell. That surrounded by red brick.

It took me only 4.5 hours to reach 2000'F, and it could have went further if I pushed it. May have went too hot for the clay I was using for the test bricks inside.
Looks to be a real improvement so far though. I will post the results soon.
Wednesday, July 14, 2010
Tennessee red clay test firing.
My wife and I went on vacation last week to the mountains of Gatlinburg, Tennessee. I gathered a sample of the well known local red clay to test once I got back home. I wanted to try it out to see how it compared to the clay from my back yard here in Indiana.

The differences in clay is most noticed by color from the iron oxides. Both types have it, but it is more obvious in states of the south. It may have to do with glaciers that overran the northern states like Indiana thousands of years ago.

The brick on top is Pigeon Forge, Tennessee red clay. The other three are Flora, Indiana brown clay. Fired in the same kiln for 9 hrs to 1875deg F. Notice the difference in shrinkage.
Heres the address if you are interested in why some clays are so much more red than brown, yellow, or grey.

The differences in clay is most noticed by color from the iron oxides. Both types have it, but it is more obvious in states of the south. It may have to do with glaciers that overran the northern states like Indiana thousands of years ago.

I brought back several pounds of red clay from my vacation in a plastic tub for test firing.
The outer two are Tennessee red clay and the inner two are Indiana clay. Green unfired from the brick press. The sample clay is very sticky and plastic. It makes a nice unfired brick.
The brick on top is Pigeon Forge, Tennessee red clay. The other three are Flora, Indiana brown clay. Fired in the same kiln for 9 hrs to 1875deg F. Notice the difference in shrinkage.

Heres the address if you are interested in why some clays are so much more red than brown, yellow, or grey.
http://www.ga.nrcs.usda.gov/technical/soils/red.html
Wednesday, June 16, 2010
Flash flood takes out my bridge!
Monday afternoon a huge line of thunderstorms tore through Indiana. Lots of wind, a few possible tornados, and massive quantities of rain. In a few hours, several inches of rain added to weeks of previous rainfall. It was too much for my old improvised steel frame bridge. The water spilled over the creek banks and swept up logs and debris. I had relied on this bridge for over ten years to cross this creek to get to my workshop trailer. Now I will be looking to push ahead with my plans to construct a larger bridge. One that a full sized truck can go over. I will keep all of you posted as I progress with it.


Tuesday, June 8, 2010
Progress at the boilerhouse.
Saturday, June 5, 2010
Firing temps and brickmaking
The finished color and hardness of a clay brick has alot to do with the highest temp achieved and length of time held there before cool down. There doesn't seem to be as much effect on outcome if the ramp up time to peak temperatre is varied shorter or longer. Obviously the type of clay will have a profound influence on the finished product as well. But here I will focus on firing temp of a single type of clay.

If I were to ever try to make pavers or outdoor tile, they would be fired much like the darker brick. I believe the water proof qualities should be higher.

Below are tiles and bricks of the exact same source of clay, prepaired the same way before firing.
They are identical except for the one brick on the lower left. The three of the same color were fired to 1900 deg F over an 8 hr period in my electric kiln. The darker brick made at the same time as the others, was fired to 2000 deg F over 9.5 hrs in the same kiln. All settings on the kiln were identical.
The surface of the darker brick is closer to that of a paver or clinker. It has a reflective quality to it that the others do not. All the bricks and tiles are fired fully and have a strong 'ring' when tapped together. The darker brick has a higher ptched ring to it.
If I were to ever try to make pavers or outdoor tile, they would be fired much like the darker brick. I believe the water proof qualities should be higher.
Notice the small paw prints on the one tile. My kittens were having fun after I made up the tiles.
Thursday, May 6, 2010
Graphic example of clay shrinkage from firing.

I hadn't ever really gave much thought to clay shrinkage from the firing process. I had read about how it is a normal thing to happen. After making a few more pressed clay bricks for a later firing, I put a finshed brick next to them to compare the colors. What caught my eye though was the size difference of before and after. Pretty amazing when you get a side by side like this.
Labels:
brick,
brickmaking,
clay,
homemade,
press
Monday, May 3, 2010
Bricks in three days


Saturday I came up with a bold idea. To see how quickly I could make a dozen bricks from start to finish. From digging up natural clay all the way to a finshed ready to use good product. It took me two days. Thats it. Three if you want to count cooldown and inspection.


Here are the steps involved and the outcome.
1. Dug up a wheelbarrow load of Flora clay straight out of the ground behind my barn. The clay was already damp from a previous days rainfall. No water will be added.
1:00 pm Saturday
2. Removed all obvious twigs, rocks, and non clay looking dirt material from the load to be formed into bricks. Flora clay at my location is nearly free of roots, rocks or sand. Unusually clean and ready to use for this area of Indiana farmland.
2:00 pm
3. Load brick press and press out 12 bricks. Used all three of my frog logos just for the heck of it.
3:30 pm
4. Load into the electric kiln to begin the drying out. This is really tricky. Too fast and they crack. Too slow and the wont dry for a month!
4:00pm to 9:00pm Saturday.
5. Fire in the electric kiln to at least 2000'F.
7:30am to 9:00pm Sunday
6. Cooldown , unload and inspection.
4:00pm Monday
Success!!!!

Subscribe to:
Posts (Atom)